If efflorescence is present, please contact our office before applying any waterproofing products for further advice.
APPLICATION REMINDERS
Substrate must be below 15% moisture before application of SEALTIGHT
DO NOT spray a “second coat” after first saturation, as this will not penetrate, leaving a flaking film when dry.
METHOD
Prepare the area by removing all loose material, ensuring the substrate is clean, sound and porous.
Once the surface has dried to a moisture content of less than 15%, verified using a suitable moisture meter, spray SEALTIGHT at 1 litre per 4-5m2 (depends on porosity, texture, and condition of substrate), to saturation (just prior to running off the surface) using a low-pressure sprayer at no more than 20psi.
Remove excess SEALTIGHT after 25 minutes using a damp sponge, cloth, or mop.
Allow SEALTIGHT to penetrate and cure for 24 hours.
DO NOT spray a “second coat” after first saturation, as this will not penetrate, leaving a flaking film when dry.
IMPORTANT
All products must be used in accordance with the current Technical Bulletins and specific project requirements, including requirements relating to dimensions, surface preparation, mixing, and application.